Judul ArtikelANALISIS SETTING RELAI JARAK SEBAGAI MEDIA PROTEKSI UTAMA SUTT 150 kV GARDU INDUK KALIBAKAL-GARDU INDUK RAWALO PT. PLN (PERSERO) P3BJB APP PURWOKERTO
AbstrakSaluran transmisi GI Kalibakal - GI Rawalo merupakan saluran transmisi yang pendek, sehingga dibutuhkan distance relay sebagai pengaman utama pada penghantar Kalibakal-Rawalo untuk mengamankan saluran transmisi dari gangguan hubung singkat. Maka dari itu dibutuhkan cara menentukan setting distance relay yang baik agar dapat bekerja dengan handal. Distance relay bekerja dengan membandingkan besaran impedansi gangguan pada saluran dengan impedansi setting relai jarak, kemudian dibagi menjadi beberapa daerah cakupan yaitu zone 1, zone 2 dan zone 3. Studi ini dilakukan untuk menganalalisis setting distance relay yang terdapat pada saluran transmisi GI Kalibakal - GI Rawalo menggunakan Matlab Simulink 7.1. Simulasi dilakukan dengan tiga lokasi gangguan yaitu 1) gangguan yang terletak pada zone 1, 2) gangguan yang terletak pada zone 2, dan 3) gangguan yang terletak pada zone 3. Dari hasil simulasi diperoleh kesimpulan bahwa gangguan yang terjadi pada masing-masing zone menyebabkan kenaikan arus dan mempengaruhi kestabilan tegangan. Dari simulasi juga diperoleh setting distance relay yang tepat yaitu setting zone 1 sebesar 0.68Ω dengan waktu kerja seketika, setting zone 2 sebesar 1.79 Ω dengan waktu kerja 0,4 detik dan setting zone 3 sebesar 2.9 Ω dengan waktu kerja 1,2 detik.
Abstrak (Inggris)Kalibakal substation – Rawalo substation transmission line is a short transmission line, so that it is required distance relay as the main protector on Kalibakal-Rawalo conductor for securing the transmission line from short circuit interruption. Therefore, it is required the method for determining the appropriate setting of distance relay in order to operate well. Distance relay operates by comparing the interrupting impedance quantity on the line with distance relay setting impedance, then it is divided into some area coverage those are zone 1, zone 2 and zone 3. This study was conducted for analizing the setting of distance relay on Kalibakal substation - Rawalo substation transmission line using Matlab Simulink 7.1. From the available model, then it was entered phases short circuit interruption and phases short circuit into the ground. Simulation was conducted by using three areas; those are 1) the interruption that occurred on zone 1, 2) the interruption that occurred on zone 2 and 3) the interruption that occurred on zone 3. From the simulation result, it can be concluded that the interruption that occurred on each zone caused the increase of current and affected the voltage stability. From the simulation, it was also obtained the appropriate distance relay settings, there are: setting zone 1 is 0.68 Ω with prompt operating time, setting zone 2 is 1.79Ω with 0.4 seconds in operating time and setting zone 3 is 2.9 Ω with 1.2 seconds operating time.
Kata KunciKata Kunci : sistem proteksi, sistem transmisi, relay distance, sutt.
Nama Pembimbing 1Dr. Eng. Suroso, S.T.,M.Eng.
Nama Pembimbing 2Daru Tri Nugroho, S.T.,M.T.
Tahun2013
Jumlah Halaman15
Page generated in 0.0545 seconds.