View Artikel Ilmiah

Kembali
NIM (Student Number)H1C018048
Nama MahasiswaHARRY ARIYANTO NUGROHO
Judul ArtikelGEOLOGI DAN SUMBER DAYA ASPAL BATU BUTON DAERAH LASEMBANGI DAN SEKITARNYA, KABUPATEN BUTON, SULAWESI TENGGARA
AbstrakPenelitian ini bertujuan untuk mengetahui kondisi geologi dan jumlah sumber daya aspal Buton pada daerah penelitian yang diharapkan dapat dijadikan acuan untuk kegiatan eksplorasi aspal Buton selanjutnya. Stratigrafi daerah penelitian dibagi menjadi 3 satuan geologi, diurutkan dari satuan tertua hingga termuda yaitu satuan perselingan Batulempung-Batupasir Sisipan Gamping, Satuan Batupasir Sisipan Batulempung, dan Satuan Perselingan Batulempung-Batupasir. Struktur geologi yang berkembang pada daerah penelitian yaitu Lipatan Sinklin Kamaru dan Sesar Mendatar Kanan Lasembangi. Kandungan aspal pada daerah penelitian terdapat pada 3 titik yaitu di titik pengamatan dengan kode H.1, SS7, H.4, SS27, dan H.8, SS40. Perhitungan potensi sumber daya aspal hanya dilakukan pada titik pengamatan H.4, SS27 dan H.8, SS40 karena bentuknya berupa perlapisan yang dapat dihitung volumenya, sendangkan pada titik pengamatan H.1, SS7 aspal hanya ditemukan mengisi pada rekahan saja. Berdasarkan keterdapatan aspal pada 2 titik pengamatan tersebut dilakukan perhitungan sumber daya pada 7 Seam. Hasil total dari perhitungan jumlah potensi sumber daya aspal daerah penelitian sebesar 34.851,26 ton.
Abstrak (Inggris)This study aims to determine the geological conditions and the amount of Buton asphalt resources in the research area which are expected to be used as a reference for further Buton asphalt exploration activities. The stratigraphy of the study area is divided into 3 geological units, ordered from the oldest to the youngest units, namely the Intercalated Claystone-Sandstone Alternation Unit, the Sandstone Intercalated Claystone Unit, and the Intercalated Claystone-Sandstone Unit. The geological structures that develop in the study area are the Kamaru Syncline Fold and the Lasembangi Right Horizontal Fault. Asphalt content in the study area is found at 3 points, namely at the observation points with codes H.1, SS7, H.4, SS27, and H.8, SS40. Asphalt resource potential calculations were only carried out at observation points H.4, SS27 and H.8, SS40 because they are in the form of layers which can be calculated by volume, while at observation points H.1, SS7 asphalt was only found filling in fractures. Based on the availability of asphalt at the 2 observation points, resource potential calculations were carried out at 7Seam. The total result of calculating the amount of asphalt resources in the research area is 34.851,26 tons.
Kata KunciAspal Alam, Buton, Sumber daya, Struktur Geologi, Stratigrafi, Keterdapatan, Seam.
Nama Pembimbing 1Ir. Siswandi, S.T.,M.T.
Nama Pembimbing 2Sigit A. Wibisono, S.T.,M.T.
Tahun2023
Jumlah Halaman7
Page generated in 0.0512 seconds.